1. The distance between the cold and hot water outlets is 13-15/cm and parallel and vertical. The constant temperature shower requires that the water outlet must be left hot and right cold. The water outlet should not be recessed more than 0.5cm into the ceramic tile surface.
2. Drain for 15 seconds and clean the sediment and impurities in the pipeline to avoid clogging the valve core.
3. When installing the main body, pay attention to checking for the presence of 6 sub sealing water washers. When fixing the nut, a pad must be used to prevent scratching the surface.
4. Open the water valve and check for any leakage at the corner connection, as well as the water outlet of the main body.
When fixing the pole for drilling, the customer must be asked if there are any water pipes or wires at the drilling position to avoid breaking the pipeline and causing unnecessary losses.
6. When inserting the upright pole, it is necessary to pay attention to whether the sealing O-ring is deformed, and the overlap between the two pipes should be deep enough to prevent water leakage due to the overlap being too short.
7. Lock the pull screw of the upright rod to prevent excessive water pressure from rushing out of the upright rod and damaging the customer's suspended ceiling.
After installation, it is necessary to check again for any water leakage or seepage at each interface.